We
knew there'd be problems before we moved in.
I didn't get that the discoloration on the floor meant water
damage. We called the insurance company
who sent a crew out June 28 and stayed with us until July 6 and disappeared.
The
insurance company had wired money to our bank in addition to paying Service
Master. okay, additional expenses like the plumber,
electrician . . . but wait. We still
need more than just a sub floor. . . Installation
We
finally heard back from Service Master on August 11, I believe. It was by phone on Friday and they said
they'd be out on Monday. They
weren't. Roland received a call after 6:00
pm on Tuesday. A representative came to
give an estimate, which Roland tore apart and ended up agreeing to dry wall
only. Oh, and let's not forget the
furnace that has been in our kitchen the last 6 weeks. And please return our daughter's possessions!
Dry
wall put in. Furnace installed but not
connected. Jenna's belongings didn't
arrive until Friday. To save ourselves
some money, we decided to paint and install the floors ourselves. Some pictures
I have posted already. But here is a
synopsis of our lives June 28 through today.
|
June 27 water damaged floor |
|
floor ripped up and fans dry out |
|
furnace lived in the kitchen along side our dining table |
|
I did try to liven it up a little |
|
didn't always work out though |
|
this would be Jenna's room June 29 |
|
Roland on cat walk fixing breaker switch Jun 30 |
|
we had pulled out 5 drawers of clothes and
stored them in the tub - it served as a temporary closet
|
|
washer and dryer lived outside |
|
July 3, Jenna's room |
|
furnace hole, Jenna's room, washer and dryer space |
|
July 6 subfoor |
|
July 6 Jenna's room |
|
furnace still not hooked up |
|
this one appears to be out of order . . . . hmm.
wall connecting to laundry wall July 1 probably
|
|
washer disconnected Aug 16 |
|
Aug 16 wall in Jenna's room |
|
sorting through clothes that Kylee gave her |
|
Aug 16 |
|
cutting drywall in our carport |
|
Aug 16 Roland spackling laundry/hall |
|
Aug 16 spackling Jenna's wall |
|
Aug 18 Jenna picked out a really loud paint |
|
August 20, finally set up for moving back in |
|
August 22 quite proud of her green wall |
|
Aug 22, start the flooring project |
|
our back porch during renovation |
|
Aug 24 |
|
our kitchen seems to have taken a dive as well |
|
Aug 25 All done.
|