We knew there'd be problems before we moved in.  I didn't get that the discoloration on the floor meant water damage.  We called the insurance company who sent a crew out June 28 and stayed with us until July 6 and disappeared.

The insurance company had wired money to our bank in addition to paying Service Master.   okay, additional expenses like the plumber, electrician . . . but wait.  We still need more than just a sub floor. . . Installation 

We finally heard back from Service Master on August 11, I believe.  It was by phone on Friday and they said they'd be out on Monday.  They weren't.  Roland received a call after 6:00 pm on Tuesday.  A representative came to give an estimate, which Roland tore apart and ended up agreeing to dry wall only.  Oh, and let's not forget the furnace that has been in our kitchen the last 6 weeks.  And please return our daughter's possessions!

Dry wall put in.  Furnace installed but not connected.  Jenna's belongings didn't arrive until Friday.  To save ourselves some money, we decided to paint and install the floors ourselves. Some pictures I have posted already.  But here is a synopsis of our lives June 28 through today.


June 27 water damaged floor


floor ripped up and fans dry out

furnace lived in the kitchen along side our dining table

I did try to liven it up a little

didn't always work out though
this would be Jenna's room June 29


Roland on cat walk fixing breaker switch Jun 30

we had pulled out 5 drawers of clothes and 
stored them in the tub - it served as a temporary closet

washer and dryer lived outside

July 3,  Jenna's room

furnace hole, Jenna's room, washer and dryer space

July 6 subfoor

July 6  Jenna's room

furnace still not hooked up

this one appears to be out of order . . . . hmm. 
wall connecting to laundry wall  July 1 probably

washer disconnected Aug 16

Aug 16 wall in Jenna's room


sorting through clothes that Kylee gave her

Aug 16

cutting drywall in our carport

Aug 16 Roland spackling laundry/hall

Aug 16 spackling Jenna's wall

Aug 18 Jenna picked out a really loud paint


August 20, finally set up for moving back in



August 22 quite proud of her green wall
Aug 22, start the flooring project


our back porch during renovation


Aug 24

our kitchen seems to have taken a dive as well

Aug 25 All done.